• Home
  • Corporate
    • Management and Board
  • Projects
    • Keefe Lake Project
    • McCarthy Lake Project
    • McGregor Lake Project
    • East Key Lake Project
    • Exploration Program
    • Applying Science
    • About Uranium
  • Investors
    • Stock Quote
    • Capital Structure
    • Request for Information
  • News
    • Press Releases
    • Upcoming Events
    • Media
  • Contact

Exploration Program

McGregor Lake / Webb River

Timeline

Z-TEM Airborne Survey
(Z-Axis Tipper EM) 2100 line km airborne survey with 200m spacing.
Geotech Ltd. www.geotech.ca

Immediately (temp sensitive) Work must be done in temp greater than -10 degrees C.

3D Inversion and Correlation with historic GEOTEM airborne data to examine conductors and faulting/controls. Enter data in GIS system to establish baselines.
Condor Consulting: http://condorconsult.com

After Z-TEM survey above.

Magnetotulleric (MT) Ground Survey
550 stations / 500m line spacing with station and line infills. Mob and De-mob / 3D interpretation correlated with Tempset Survey data to refine drill targets.
Goldak EM-PULSE: http://www.empulse.ca

April/May 2011/ Above Zero Conditions

Diamond Drilling
Helicopter supported diamond drill program: 12 holes: 300m/hole with 4 setups with 3-4 declinations.


Weather independent / subject to ground geophysics

 

McCarthy Lake

Timeline

3D Inversion and Correlation with historic “Tempset” airborne data to examine conductors and faulting/controls. Enter data in GIS system to establish baselines.
Condor Consulting: http://condorconsult.com

TBA 2011

Magnetotulleric (MT) Ground Survey 364 stations / 500m line spacing with station and line infills. 3D interpretation correlated with Tempset Survey data to refine drill targets.
Goldak EM-PULSE:  http://www.empulse.ca

TBA 2011

Diamond Drilling
Helicopter supported diamond drill program: 10 holes: 300m/hole with 3 setups with 3-4 declinations.


TBA 2011

Background

McGREGOR LAKE PROJECT

The McGregor Lake Project was surveyed by UEX in 2006, utilizing Furgo’s GEOTEM system. The regional survey identified potential faulting and EM anomalies of interest.  The Project is adjacent to Denison/JNR’s Moore lake project.  Digital data is available for the GEOTEM survey.

WEBB RIVER PROJECT

Webb River straddles the basin margin.  An array of ground conductors, identified by Uranerz through a VLF-EM survey in 1980, appears to be related to magnetic lows. Digital ground survey data of assessment file 74H10-0020 is not available.

McCARTHY LAKE PROJECT

McCarthy was surveyed by Fugro in 2007 with a Tempest Mag/EM system.  Conductive anomalies coincident with magnetic breaks were noted. Anomalies at McCarthy are visible at ~200-250m depth and appear to exist above the unconformity.


TSX-V: UAX

CA$0.18 ▲0.005 (2.78%)
CVE:UAX

Company ID [CVE:UAX] Last trade:CA$0.18 Trade time:12:56PM EST Value change:▲0.005 (2.78%)

Projects

  • Keefe Lake Project
  • McCarthy Lake Project
  • McGregor Lake Project
  • East Key Lake Project
  • Exploration Program
  • Applying Science
  • About Uranium

Athabasca Uranium Inc. Jan. 2012 Presentation


Athabasca Uranium Hot Sheet Jan 2012

Subscribe to our Newswire!

Your Email:
Athabasca Uranium Inc. Scroll To Top